Deadline: July 15th
00
Days
00
Hours
00
Minutes
00
Seconds
About the Challenge
![Track 1](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/1-new-solutions-150x150.png)
Track 1
Enhancing the performance of air conditioning equipment by implementing new solutions
![Track 2](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/2-solar-energy-150x150.png)
Track 2
Utilization of renewable energy in air conditioning systems
![Track 3](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/3-indoor-planting-2-150x150.png)
Track 3
Introducing air conditioning equipment for agriculture applications (for indoor planting) suitable for high temperature and humidity regions.
![Track 4](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/4-3D-printing-150x150.png)
Track 4
Utilization of 3D printing technology in HVAC Industry
![Track 5](https://skmchallenge.com/wp-content/uploads/sites/237/2020/03/5-Casing-updated-150x150.png)
Track 5
Using nonmetallic parts/ casings for air conditioning equipment
![Track 6](https://skmchallenge.com/wp-content/uploads/sites/237/2020/03/6-Humidity-updated-150x150.png)
Track 6
Air conditioning system solutions for open areas in high humidity climate
![Track 7](https://skmchallenge.com/wp-content/uploads/sites/237/2020/03/7-CFD-Simulation-updated-150x88.jpeg)
Track 7
Implementation of CFD and other simulation software to enhance the performance of air conditioning equipment
![Track 8](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/8-heat-loses-150x150.png)
Track 8
Utilization of heat losses from air conditioning equipment
![Track 9](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/9-Manufacturing-150x150.png)
Track 9
Using new techniques in manufacturing of Air conditioning equipment
![Track 10](https://skmchallenge.com/wp-content/uploads/sites/237/2020/03/10-Corrosion-updated-150x150.png)
Track 10
Solutions for enhancing corrosion resistance
![General Track](https://skmchallenge.com/wp-content/uploads/sites/237/2020/02/11-Other-150x150.png)
General Track
Other solutions related to HVAC apply.
Challenge Process
Open applications for phase 1
Submit project proposal relevant to tracks. Applications close on July 15th, 2020 at 11:59PM (GMT).
Evaluation of phase 1 applications
Announcing and contacting shortlisted candidates.
Open submissions for phase 2
Shortlisted candidates submit their proofs of concept.
Evaluation of phase 2 submissions
Challenge winners announcement.
Judging Criteria
Implementation feasibility
Design & Methodology
The authenticity of the proposed idea
Awards
1st place: $15,000, plus commercialization support
2nd place: $10,000, plus commercialization support
3rd place: 5 winners to get commercialization support for their projects